Design supervision must show more than the fact that a site visit took place. It must trace each design matter: what was observed, which design decision it affects, who assigned the action and what evidence confirms close-out.
The evidential basis
- A visit plan linked to critical construction stages.
- A record of the actual observation, including the area, date and current design revision.
- A comment stating the required action, owner and deadline clearly.
- Evidence of rectification or an approved design decision.
How to control departures
- Register the matter and prevent the deviation from developing without control.
- Review the original design decision and its impact on interfacing disciplines.
- Obtain a decision from the authorised designer.
- Issue the decision to the relevant parties and update related drawings or records.
- Verify implementation and close the matter while preserving the full history.
Typical weaknesses
- Comments remain only in a site log or correspondence.
- A verbal agreement is never converted into a controlled document.
- A revised decision is not communicated to every affected party.
- Close-out is recorded without verifying the actual condition again.
The result of a controlled system
The Design Supervision package creates one workflow for visits, comments, departures, design decisions and supporting evidence. This protects the engineering intent and preserves a defensible history of decisions.