A weak system stores certificates, laboratory reports, inspections and comments in separate folders. A strong system links them to the same material batch, work area and acceptance decision.

01

Material control

  • The delivery, batch, supplier and accompanying documents.
  • The incoming-inspection result and release decision.
  • The storage location and actual place of use.
  • Related samples, tests and construction records.
02

Inspection and testing

  • An inspection and test plan with criteria, frequencies and control points.
  • Notification of the relevant parties before access to the work is closed.
  • Registration of the inspection result and supporting record.
  • A defined rule for continuing work when a comment or nonconformity is raised.
03

Nonconformity management

  1. Record the condition and its impact.
  2. Quarantine the material or define the status of the work.
  3. Agree the technical disposition.
  4. Implement the corrective action.
  5. Verify the result and close the record with evidence.
04

Management outcome

An integrated quality system shows more than the number of tests. It shows the readiness of every area: materials verified, inspections completed, comments closed and records accepted.