An as-built survey drawing has value only when its origin can be verified: from the survey control and field measurement to the specific structure, design revision and accepted result.
Source information
- The accepted survey control network and its condition.
- The coordinate and vertical datum and the control points used.
- The current drawing revision and permissible tolerances.
- The limits of the area, structural element or system.
Field and office workflow
- The survey task and unambiguous identification of the measured asset.
- The field data file, date, instrument and surveyor.
- A completeness check and calculation of actual deviations.
- Issue of the drawing with an unambiguous link to the work and register.
Checks before submission
- Compare the drawing with the current design.
- Check symbols, scale, coordinates and levels.
- Link the drawing to the acceptance record, log and measured work quantity.
- Register comments and evidence of their resolution.
- Include the accepted revision in the final completion dossier.
How the packages are divided
The specialist surveying package organises the survey team's work across the project. The discipline-specific surveying module integrates measurements and drawings into the evidence chain for a particular type of construction work.