After concreting, backfilling, insulation or closure by finishes, some evidence cannot be recovered without opening up the work. The required records must therefore be planned alongside the construction sequence.

01

Before the operation starts

  • Define the control point and readiness criteria.
  • Check materials, drawings and the preceding work stage.
  • Set the date for notifying the relevant parties.
  • Prepare the record form and a location for the as-built drawing.
02

Before access is closed

  • Record the actual parameters and their location reference.
  • Obtain all required test results.
  • Close comments or formally define the next action in writing.
  • Register the final record in the master register.
03

Which package to choose

The Contractor Documents package supports the contractor's overall process. For earthworks, foundations, utility networks or finishes, add the package for the relevant work discipline.

PD