An effective inspection and test plan links each operation to its acceptance criteria, control point, responsible party and the record that demonstrates the result.

01

What each ITP line should contain

  • The operation and applicable work area.
  • The characteristic to be controlled and its acceptance criteria.
  • The inspection method and frequency.
  • The hold, witness, document-review or surveillance point.
  • The responsible parties and supporting record.
02

What makes an ITP manageable

  • Plan notifications before access to the work is closed.
  • Define a clear rule for proceeding when a comment is raised.
  • Link the activity to the current drawing revision and method statement.
  • Register the result in a single inspection register.
03

How a ready-made package helps

The ProjectDocs package for construction laboratories and quality management provides a coordinated structure for the ITP, inspection, material, test and nonconformity registers. The team does not have to design the relationship between controls and evidence from scratch.