Technical supervision activities must leave a clear audit trail: what was inspected, against which requirement, what decision was made and what evidence confirms that the comment was closed.
The basis of a defensible record
- The area, system or structure inspected.
- The current drawing and applicable requirement.
- The date, participants and actual inspection result.
- The comment, responsible person, deadline and close-out evidence.
Typical weaknesses
- A comment exists in correspondence but is absent from the central register.
- Close-out is asserted verbally without a photograph, record or repeat inspection.
- The inspection is not linked to the acceptance record, drawing or measured quantity.
- Open matters are lost when personnel change.
The ready-made ProjectDocs solution
The Technical Supervision Documents package provides a systematic framework for inspections, comments, verification of concealed works and confirmation of completed work.