A contractor needs more than a collection of forms and registers. The team needs an integrated system that supports the work from mobilisation and incoming inspection through comment close-out and handover to the client.

01

Five working control areas

  • Organisational documents, appointments and authorisations.
  • Incoming inspection of materials and equipment.
  • Control of operations, concealed works, testing and surveying.
  • As-built drawings, acceptance records and the comments register.
  • Compilation of the final dossier by area and system.
02

Why isolated templates are not enough

Disconnected files do not show who is accountable, when a document is due or what it must be linked to. Construction records then fall behind physical progress, and gaps are discovered immediately before acceptance.

03

The ready-made ProjectDocs solution

The Contractor Documents package connects roles, control activities, registers and the handover workflow. It is designed for teams that want to launch a controlled system immediately instead of searching for the next form.