Document control is not file storage. It must answer four questions unambiguously: which revision is current, to whom it was issued, what the recipient is expected to do and where the final record is held.

01

Rules to establish before the first issue

  • A consistent coding and naming structure.
  • A controlled list of document types, statuses and purposes of issue.
  • Authority for preparation, review, approval and registration.
  • The folder structure, master register and backup rule.
02

Formal transmission

  • A transmittal listing the documents and their revisions.
  • An unambiguous purpose: for information, review, approval or construction.
  • The response deadline and expected recipient action.
  • Registration of the return, comments and subsequent revision.
03

Current-revision control

  1. Register the new revision.
  2. Verify authority and issue completeness.
  3. Transmit it to the defined recipient group.
  4. Update the status of the previous revision.
  5. Confirm use of the current revision in the work area.
04

Archive readiness

When issue history and statuses are controlled from the start of the project, the final archive becomes a natural continuation of the process. Without this discipline, the team must reconstruct the origin of files immediately before handover.

PD

Ready-to-use packages for this task

Ready to implement the process?R02-DCCProject document control
View package and order