Construction records become a problem not at the end of a project, but the moment work begins without defined roles, registers and control points.

01

Before work starts

  • Appoint a process owner for construction records and responsible persons for each work discipline.
  • Approve document coding, the folder structure and a single master register.
  • Agree the forms, review workflows and turnaround times for comments.
  • Link the inspection and test plan, inspection notifications and records for work to be concealed.
02

During construction

  • Do not allow signatures or as-built drawings to accumulate until month-end.
  • Link every record to the location, date, drawing, material batch and inspection result.
  • Hold a short weekly reconciliation of physical progress against construction-record readiness.
03

Before handover

  • Check completeness by area and system, not only by file type.
  • Separate accepted records from drafts and files with open comments.
  • Build the final completion dossier progressively, well before commissioning and handover.